Certified payroll / Field guide
Iowa certified payroll and prevailing wage reporting.
Iowa has no state prevailing wage law, and cities cannot exceed state wage rules. Davis-Bacon covers federally funded work over $2,000 with weekly certified payroll.

Compliance at a glance
Iowa prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | None. Iowa has no state prevailing wage law. Iowa Code 364.3(12) bars city employment terms that exceed state or federal law. |
| Agency | No state prevailing wage agency. The U.S. Department of Labor enforces Davis-Bacon on federal work. |
| Covered projects | No state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000. |
| How rates are set | No state rates. On Davis-Bacon work, the U.S. Department of Labor sets rates in wage determinations published on SAM.gov, and the contracting agency puts the right one in the contract. |
| Certified payroll | Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional. |
| Where to file | On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them. |
| Contractor registration | Iowa Code chapter 91C requires contractors earning $2,000 or more a year to register with the Department of Inspections, Appeals, and Licensing. This is general, not public works specific. Fee not confirmed. |
| Apprentices | No state rules. On Davis-Bacon work, apprentices may be paid less only if individually registered in a registered program, within the program ratio. |
| Other requirements | On Davis-Bacon work, post the wage determination and the WH-1321 poster at the site where workers can easily see them. City wage ordinances adopted before March 30, 2017 that exceed state law are void. |
| Record retention | No state rule. On Davis-Bacon work, payroll records must be kept at least 3 years after all work on the prime contract is completed. |
| Penalties | No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years. |
| Recent changes | None found. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law. |
01 / In practice
Iowa has no state prevailing wage law
The U.S. Department of Labor lists Iowa among the states without a prevailing wage law. No state agency sets wage rates for state or local public works, and Iowa has no state certified payroll form or filing system. Federal rules can still apply, as described below. On a project paid only with state or local money, payroll reporting terms come from the owner's contract.
02 / In practice
City wage ordinances are limited
Iowa Code section 364.3, subsection 12, limits what cities can do. A city may not adopt or enforce an ordinance or resolution setting terms of employment that exceed or conflict with federal or state law on minimum or living wages, leave, hiring practices, benefits, scheduling, or other terms of employment. Ordinances adopted before March 30, 2017 that violate it are void. Check with the owner before assuming any local wage rule applies to a city contract.
Where teams get burned
Most Iowa payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
Davis-Bacon applies to federally funded work
Federal rules apply when an Iowa project uses federal money. The Davis-Bacon Act covers federal contracts over $2,000 for construction, alteration, or repair of public buildings or public works. Related acts extend the same labor standards to many projects built with federal grants, loans, or other assistance. That includes work run by Iowa agencies, counties, and cities. When coverage applies, the contract will include the Davis-Bacon clauses and a wage determination.
04 / In practice
Find the wage determination on SAM.gov
The Department of Labor publishes Davis-Bacon wage determinations on SAM.gov. The contracting agency picks the one that fits the project's county and construction type and puts it in the contract. Classify each worker by the work performed. Post the wage determination and the WH-1321 poster where workers can easily see them. Apprentices can be paid apprentice rates only when they are individually registered in a registered apprenticeship program.
05 / In practice
Submit weekly certified payroll on covered projects
Each contractor and subcontractor submits payroll information every week. Payrolls go to the federal agency when it is a party to the contract. Otherwise they go to the applicant, sponsor, or owner, such as a city or county, which sends them on. Form WH-347 is optional, but each payroll needs a signed Statement of Compliance. Review each week internally first, then submit as the contract directs. Violations can lead to withholding, termination, and three year debarment.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- U.S. Department of Labor · Dollar Threshold Amount for Contract Coverage Under State Prevailing Wage Laws ↗
- Iowa Legislature · Iowa Code § 364.3 ↗
- U.S. Department of Labor · Fact Sheet #66: Davis-Bacon and Related Acts ↗
- U.S. Department of Labor · Instructions for Form WH-347 ↗
- Iowa Legislature · Iowa Code § 91C.1 ↗
Sources checked November 17, 2026.
Does Iowa have a prevailing wage law?
No. The U.S. Department of Labor lists Iowa among the states without a prevailing wage law. Prevailing wages still apply on federally funded or assisted construction covered by the Davis-Bacon Act and related acts. The contract tells you when they apply.
Can an Iowa city set its own wage rules?
Iowa Code section 364.3 bars a city from adopting or enforcing ordinances on terms of employment that exceed or conflict with federal or state law on minimum or living wages, benefits, and other terms. City ordinances adopted before March 30, 2017 that violate this are void and unenforceable.
When does prevailing wage apply in Iowa?
It applies on construction covered by the Davis-Bacon Act or a related act. That includes federal contracts over $2,000 for public buildings or public works and many projects built with federal grants or loans. The contract will include a wage determination from SAM.gov.
How often do I submit certified payroll on a federal project in Iowa?
Weekly. Each contractor and subcontractor submits payroll information every week to the contracting agency, or to the local owner when the federal agency is not a party. Form WH-347 is optional, but a signed Statement of Compliance must go with each payroll.
Start with one project.
Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.