New Hampshire certified payroll and prevailing wage reporting.
New Hampshire prevailing wage: the state law, RSA chapter 280, was repealed in 1985. Federal Davis-Bacon still covers federally funded construction over $2,000.

Compliance at a glance
New Hampshire prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | None. New Hampshire repealed its public works minimum wage law, RSA chapter 280, effective July 13, 1985. |
| Agency | None at the state level. The U.S. Department of Labor Wage and Hour Division enforces Davis-Bacon on federally funded work. |
| Covered projects | No state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon. |
| How rates are set | No state rates. Davis-Bacon wage determinations are posted on SAM.gov and included in the contract. |
| Certified payroll | Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional. |
| Where to file | On Davis-Bacon work, payrolls go to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor or owner that keeps the records. |
| Contractor registration | None for prevailing wage purposes. |
| Apprentices | No state rule. On Davis-Bacon work, apprentices get a lower rate only if registered in an approved program and within its ratio. |
| Other requirements | No state prevailing wage posting or affidavit. Follow any payroll or wage terms the public owner writes into the contract. |
| Record retention | No state rule. Under 29 CFR 5.5, contractors keep payrolls and basic records for at least 3 years after all work on the prime contract is complete. |
| Penalties | No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution. |
| Recent changes | None found. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000. With no state law, it is the only prevailing wage rule on most projects. |
01 / In practice
New Hampshire repealed its prevailing wage law
New Hampshire has no state prevailing wage law. Its old law, RSA chapter 280, set minimum wages for workers on public works. The legislature repealed the entire chapter in 1985, effective July 13, 1985. The U.S. Department of Labor lists New Hampshire among states with no prevailing wage law. There are no state rate schedules or state certified payroll filings for state or local public works.
02 / In practice
What still applies on state and local projects
Without a state law, state and local projects pay under normal wage and hour rules. Read the contract closely. A public owner can still write payroll reporting or wage terms into its own bid documents. Many projects also carry federal money. When they do, federal Davis-Bacon rules apply to the whole covered contract, even if the state or town is the owner.
Where teams get burned
Most New Hampshire payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
Davis-Bacon applies on federally funded work
Federal Davis-Bacon and Related Acts rules apply to federally funded or assisted construction contracts over $2,000 in New Hampshire. This includes federal contracts and projects paid for with federal grants, loans or loan guarantees, such as highway, housing and water projects. Contractors pay at least the rates in the wage determination for the county and type of work. Wage determinations are posted on SAM.gov and attached to the contract.
04 / In practice
Submit weekly certified payroll on federal projects
On Davis-Bacon projects, each contractor and subcontractor submits certified payroll every week. Payrolls go to the federal agency when it is a party to the contract. Otherwise they go to the applicant, sponsor or owner, who passes them on to the funding agency. Form WH-347 is optional. The weekly payroll information and the signed statement of compliance are required. Review each week internally before you sign and submit.
05 / In practice
Keep federal records ready for review
Payroll on Davis-Bacon work must show each worker's classification, hours, rates, fringe benefits, deductions and pay. Check the classification on every line against the wage determination in your contract. Apprentices can be paid less than the journey rate only when they are in a registered program. Keep copies of every certified payroll you submit, along with the time records behind them.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- New Hampshire General Court · RSA Chapter 280 (repealed) ↗
- U.S. Department of Labor · State Prevailing Wage Laws ↗
- U.S. Department of Labor · Davis-Bacon and Related Acts ↗
- U.S. Department of Labor · Form WH-347 Certified Payroll ↗
- eCFR, 29 CFR 5.5 Contract provisions ↗
Sources checked November 17, 2026.
Does New Hampshire have a prevailing wage law?
No. New Hampshire repealed RSA chapter 280, its public works minimum wage law, in 1985, effective July 13, 1985. The state does not publish prevailing wage rates for state or local projects. Federal Davis-Bacon rules still apply to federally funded construction.
When does Davis-Bacon apply in New Hampshire?
Davis-Bacon and Related Acts rules apply to federally funded or assisted construction, alteration or repair contracts over $2,000. Contractors pay at least the rates in the wage determination, found on SAM.gov and in the contract, and submit weekly certified payroll.
Where do I find New Hampshire wage determinations?
For Davis-Bacon projects, wage determinations are on SAM.gov and should be included in your contract. They list rates by county and type of construction. There is no state schedule for New Hampshire because the state law was repealed.
Do I have to use Form WH-347?
No. The U.S. Department of Labor says Form WH-347 is optional. You still have to submit the same payroll information each week with a signed statement of compliance to the federal agency or the funding recipient.