Certified payroll / Field guide
Minnesota certified payroll and prevailing wage reporting.
Minnesota prevailing wage covers state-funded projects over $25,000, or $2,500 for one trade. DLI rates, certified payroll every two weeks, records and penalties.

Compliance at a glance
Minnesota prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | Minnesota Prevailing Wage Act, Minnesota Statutes 177.41 to 177.44, and Minnesota Rules 5200.1000 to 5200.1120. |
| Agency | Department of Labor and Industry (DLI). MnDOT Labor Compliance handles state highway contracts. |
| Covered projects | Projects financed in whole or part by state funds, including grants and loans. Exempt if under $2,500 with one trade, or $25,000 or less with more than one trade. |
| How rates are set | DLI certifies rates from an annual statewide survey by county. Commercial rates cover buildings and highway and heavy rates cover roads and utilities. Rates are on the DLI website and in the contract. |
| Certified payroll | Every two weeks, signed under oath by an owner or officer, using the DLI form or equivalent. Contracts require payrolls within 14 days after each pay period. |
| Where to file | To the contracting authority and the project owner. |
| Contractor registration | No prevailing wage registration. Contracts over $50,000 require a responsible contractor verification under 16C.285. DLI construction contractor registration applies to unlicensed commercial contractors. |
| Apprentices | Only apprentices in a registered program may be paid apprentice rates, set by the program. No state utilization requirement found for prevailing wage projects. |
| Other requirements | Post rates and hours conspicuously on the project. Pay 1.5 times the basic rate over 8 hours a day or 40 a week. Grantees may need to certify prevailing wage to DLI. |
| Record retention | Keep records for 3 years after the contracting authority makes final payment, available to DLI on demand or within 72 hours. |
| Penalties | Underpayment is a misdemeanor, up to $700 and 90 days per day of violation. Records fines reach $1,000 per failure and $5,000 for repeats. DLI can order back wages and withholding. |
| Recent changes | Laws 2023 c. 53 and 2024 c. 110 amended sections 177.30 and 177.42. The responsible contractor law was amended in 2025. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law. |
01 / In practice
Know when Minnesota prevailing wage applies
The Department of Labor and Industry (DLI) enforces the Minnesota Prevailing Wage Act, Minnesota Statutes 177.41 to 177.44. It covers demolition, construction, alteration, remodeling, or repair of a public building, structure, land, or other public work financed in whole or part by state funds. It also applies when state funds pay for acquisition, predesign, design, or demolition. It does not apply under $2,500 when one trade is needed, or under $25,000 when more than one trade is needed.
02 / In practice
How rates are set and found
DLI sets certified rates comparable to wages paid for similar work in the county where the project is located. The rate is the hourly basic rate plus benefit contributions paid to the largest number of workers in the same class in the area. Commercial rates apply to state-funded buildings, including colleges and schools. Highway and heavy rates apply to roads, bridges, runways, and utilities. Rates must be set before bids and stated in the contract.
Where teams get burned
Most Minnesota payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
Submit certified payroll every two weeks
Under 177.30, employers on state-funded public works must furnish a certified payroll report every two weeks to the contracting authority and the project owner. An owner or officer signs it under oath. It lists each worker's name, ID number, job classification, daily and total hours, rate, gross pay, deductions, net pay, and hourly benefit contributions. Contracts must also require payrolls within 14 days after each pay period. Review each report internally, then submit it.
04 / In practice
Pay overtime and post the rates
Prevailing hours of labor cannot exceed eight hours a day or 40 hours a week. Hours beyond the prevailing hours must be paid at least 1-1/2 times the hourly basic rate. Each contractor and subcontractor must post the rates and hours in at least one conspicuous place on the project. The law covers drivers who deliver sand, gravel, or stone and deposit it in place. It does not cover suppliers delivering from a fixed place of business.
05 / In practice
Keep records three years after final payment
On state-funded public works, keep payroll records for three years after the contracting authority makes final payment on the project. Records must be ready for DLI inspection on demand, either at the work site or within 72 hours. DLI can fine an employer up to $1,000 for each failure to keep required records and up to $5,000 for each repeated failure. These fines add to other wage penalties.
06 / In practice
Enforcement, withholding and penalties
Paying less than the contract's prevailing wage rate is a misdemeanor, with a fine of up to $700, up to 90 days in jail, or both. Each day is a separate offense. After a compliance order, DLI orders the contracting authority to withhold enough from the prime contractor to cover back wages. On state highway contracts under 177.44, the Department of Transportation enforces the law and may demand payroll copies.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- Minnesota DLI · Prevailing-wage information ↗
- Minnesota DLI · Prevailing wage: Contracting agencies ↗
- Minnesota Revisor of Statutes · Section 177.43 ↗
- Minnesota Revisor of Statutes · Section 177.30 ↗
- Minnesota Revisor of Statutes, Section 16C.285 ↗
Sources checked November 17, 2026.
How often do I submit certified payroll in Minnesota?
Every two weeks on state-funded public works. Under 177.30, an owner or officer signs the report under oath and sends it to the contracting authority and the project owner. Contracts must also require copies of payrolls within 14 days after the end of each pay period.
What are the Minnesota prevailing wage thresholds?
The law does not apply when the estimated total cost is under $2,500 and only one trade is needed. It also does not apply when the cost is under $25,000 and more than one trade is needed. Larger state-funded projects are covered.
Who enforces prevailing wage on MnDOT jobs?
The Minnesota Department of Transportation enforces prevailing wage on state highway contracts and may demand payroll copies. Its Labor Compliance unit handles those projects. DLI's Prevailing Wage unit handles other state-funded projects and investigates complaints.
How long must I keep prevailing wage records?
On state-funded public works, keep records for three years after the contracting authority makes final payment on the project. They must be available to DLI on demand, at the work site or within 72 hours. DLI can fine up to $1,000 for each failure to keep records.
What is the penalty for underpaying in Minnesota?
Paying less than the contract's prevailing wage rate is a misdemeanor punishable by a fine up to $700, up to 90 days in jail, or both. Each day is a separate offense. DLI can also order back wages and have the contracting authority withhold payment.
Start with one project.
Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.