Skip to content

Certified payroll / Field guide

Utah certified payroll and prevailing wage reporting.

Utah has no state prevailing wage law since its 1981 repeal. Learn when federal Davis-Bacon applies, weekly certified payroll rules, and where to find rates.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

Utah prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

Utah compliance summary
LawNone. Utah repealed its state prevailing wage law in 1981.
AgencyNone at the state level. The U.S. Department of Labor administers Davis-Bacon on federally funded work.
Covered projectsNone under state law. Federal contracts over $2,000 and federally assisted projects are covered by Davis-Bacon and Related Acts.
How rates are setNo state rates. Federal wage determinations are set by the U.S. Department of Labor and posted on SAM.gov.
Certified payrollNot required by state law. Davis-Bacon work needs weekly certified payroll. Form WH-347 is optional if the same Statement of Compliance is used.
Where to fileOn federal jobs, the federal agency if it is a party to the contract. Otherwise the applicant, sponsor, or owner, which forwards it.
Contractor registrationNone for public works.
ApprenticesNone under state law. Federal rules apply on Davis-Bacon work.
Other requirementsNone under state law. Check each contract for owner-added wage or reporting terms.
Record retentionNone under state law. Davis-Bacon payroll records must be kept 3 years after the work is complete.
PenaltiesNone under state law.
Recent changesBills to restore a state wage failed. H.B. 458 failed in 2024. H.B. 245, the Construction Wage Standard Act, was filed as not passed on March 6, 2026.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000. It is the only prevailing wage rule for public work in Utah.

01 / In practice

Utah has no state prevailing wage law

Utah does not have a state prevailing wage law for public works. The Legislature repealed the state law in 1981, over the Governor's veto. A U.S. Bureau of Labor Statistics review of 1981 state laws noted that Utah was the only state to repeal its law that year. Since then, state and local public works in Utah do not carry a state prevailing wage or state certified payroll requirement. Federal rules can still apply when federal money is involved.

02 / In practice

Federal Davis-Bacon rules still apply

The Davis-Bacon Act covers federal contracts over $2,000 for the construction, alteration, or repair of public buildings or public works. Related Acts extend the same rules to projects that federal agencies assist with grants, loans, loan guarantees, or insurance. Many Utah highway, water, housing, and school projects carry federal money, so these rules often apply. Workers must get at least the locally prevailing wages and fringe benefits listed in the wage determination in the contract.

Where teams get burned

Most Utah payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Weekly certified payroll on federal jobs

On Davis-Bacon work, each contractor and subcontractor submits a certified payroll every week for the prior week. It goes to the federal agency if that agency is a party to the contract. Otherwise it goes to the applicant, sponsor, or owner, which sends it on to the funding agency. The WH-347 form is optional, but any substitute must include the same signed Statement of Compliance. Check each week internally against the wage determination before you sign and submit it.

04 / In practice

Find federal wage determinations on SAM.gov

The U.S. Department of Labor sets Davis-Bacon rates and publishes wage determinations on SAM.gov. The site is open to the public as well as to contracting officers. Use the determination that is in your contract, and match each worker to a classification based on the work performed. If a needed classification is missing, ask the contracting agency to request one. Prime contracts over $100,000 also require time and a half for hours over 40 in a workweek.

05 / In practice

Recent bills have not passed

Lawmakers have proposed bringing prevailing wage back. House Bill 458 in the 2024 General Session would have directed the Labor Commission to set wages for construction occupations in each county. The House struck its enacting clause on March 1, 2024, and the bill did not pass. House Bill 245, the Construction Wage Standard Act, also failed in the 2026 General Session and was filed as not passed on March 6, 2026. Watch each session for new bills. Until a law passes, check each contract for any wage terms the owner adds on its own.

FAQ

Questions people ask

Something else? Ask the team

Does Utah have a prevailing wage law?

No. Utah repealed its state prevailing wage law in 1981, and the Legislature has not passed a new one. A 2024 bill, House Bill 458, would have created one, but it did not pass. House Bill 245 in the 2026 General Session also failed. Federal Davis-Bacon rules still apply to many projects that use federal money.

When do I need certified payroll on a Utah project?

You need weekly certified payroll when the project is covered by Davis-Bacon or a Related Act. That usually means a federal contract over $2,000 or a project with federal grants, loans, or other assistance. Some owners also require payroll reports in their own contracts, so read the contract and specifications.

Do I have to use the WH-347 form?

No. The U.S. Department of Labor says the WH-347 is optional. You must still submit payroll information every week. If you use your own format, it must include the same signed Statement of Compliance wording as the WH-347.

Where do I find Davis-Bacon rates for Utah?

Federal wage determinations are posted on SAM.gov, which anyone can search. The determination that applies is the one included in your contract or bid documents. Classify each worker by the work they actually do, and pay at least the listed wage and fringe benefits.

Start with one project.

Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.