Skip to content

Certified payroll / Field guide

Arkansas certified payroll and prevailing wage reporting.

Arkansas prevailing wage was repealed by Act 1068 of 2017. See what that changed, when federal Davis-Bacon still applies, and how weekly certified payroll works.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

Arkansas prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

Arkansas compliance summary
LawNone. Act 1068 of 2017 (SB 601) repealed the Arkansas Prevailing Wage Law, Ark. Code 22-9-301 to 22-9-315, effective April 6, 2017.
AgencyNone at the state level. The U.S. Department of Labor Wage and Hour Division enforces Davis-Bacon on federally funded work.
Covered projectsNo state prevailing wage requirement in Arkansas. Only federally funded or assisted construction contracts over $2,000 carry Davis-Bacon wage rules.
How rates are setNo state rates. Federal wage determinations are issued by the U.S. Department of Labor and published on SAM.gov.
Certified payrollNot required by state law. Davis-Bacon contracts require weekly certified payroll with a signed statement of compliance. Form WH-347 is optional.
Where to fileNo state filing. On federal jobs, file with the federal contracting agency or the owner or sponsor named in the contract.
Contractor registrationNone for prevailing wage purposes.
ApprenticesNo state rule. On Davis-Bacon work, apprentices must be in a registered program and within its ratio to be paid apprentice rates.
Other requirementsNone under state law. Follow the bid package and contract terms.
Record retentionNo state rule. Davis-Bacon contractors keep payroll records for 3 years after the work is completed.
PenaltiesNone under state prevailing wage law. Davis-Bacon violations can bring withholding, back wages, contract termination, and debarment.
Recent changesNone found.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law.

01 / In practice

Arkansas repealed its prevailing wage law in 2017

Act 1068 of 2017, Senate Bill 601, repealed the Arkansas Prevailing Wage Law at Arkansas Code sections 22-9-301 through 22-9-315. The Governor approved it on April 6, 2017. It carried an emergency clause, so it took effect on approval. The repealed law covered public works construction where labor and material cost more than $75,000, and the Department of Labor set the rates. Today no state agency sets public works wage rates or collects certified payroll for projects paid only with state or local money.

02 / In practice

Federal Davis-Bacon still applies on federal money

The lack of a state law does not remove federal rules. The Davis-Bacon and Related Acts apply to contractors and subcontractors on federally funded or assisted contracts over $2,000 for the construction, alteration, or repair of public buildings or public works. In Arkansas, that can include projects run by a state agency, city, or county when federal money is part of the funding. Read the contract for the Davis-Bacon clauses. If they are there, the federal wage and payroll rules apply to every covered worker on the site.

Where teams get burned

Most Arkansas payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Find the wage determination on SAM.gov

Federal prevailing wage rates come from wage determinations issued by the U.S. Department of Labor. Contracting officers get them from SAM.gov, and the public can search the same site. The determination is attached to the contract or bid documents. It lists the minimum hourly rate and fringe benefit for each classification in the county. Classify each worker by the work actually performed, not by job title. Track hours by classification when a worker moves between trades during the week.

04 / In practice

Review weekly payroll, then submit it

Covered contractors must submit payroll information every week. If a federal agency is a party to the contract, the certified payroll goes to that agency. If not, it goes to the applicant, sponsor, or owner that keeps the records, which sends it on to the federal agency providing the funds. Form WH-347 is optional, but the same information and a signed statement of compliance are required. Check rates, hours, and fringes internally first. Then submit it to the recipient named in the contract.

05 / In practice

Check older contracts and bid packages

Some owners still use specifications written before 2017. If a state or local contract cites the repealed Arkansas law, ask the owner in writing how it wants that language handled. Federal grants and loans can also flow through state agencies to cities, counties, and school districts. When the contract includes Davis-Bacon clauses and a wage determination, set up that job in payroll with its rates and fringes before the first week closes.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

Does Arkansas still have a prevailing wage law?

No. Act 1068 of 2017 repealed Arkansas Code sections 22-9-301 through 22-9-315, the Arkansas Prevailing Wage Law. It took effect when the Governor approved it on April 6, 2017. Federal Davis-Bacon rules still apply to federally funded or assisted construction over $2,000.

What did the old Arkansas law cover?

The repealed law required prevailing wages on public works construction where the cost of all labor and material exceeded $75,000. It excluded maintenance work. The Arkansas Department of Labor set rates by county or locality. None of that applies to contracts after the 2017 repeal unless federal rules or the contract terms say otherwise.

When do I need certified payroll in Arkansas?

You need it on contracts covered by the Davis-Bacon and Related Acts. That means federally funded or assisted contracts over $2,000 for construction, alteration, or repair of public buildings or works. Submit payroll weekly to the federal agency, or to the owner that forwards it to the funding agency.

Do I have to use Form WH-347?

No. The U.S. Department of Labor says use of Form WH-347 is optional. You still must submit the same payroll information every week with a signed statement of compliance. Many contractors use the WH-347 layout or a payroll system report that carries the same fields.

Start with one project.

Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.