Vermont certified payroll and prevailing wage reporting.

Vermont prevailing wage under 29 V.S.A. § 161: state projects over $100,000, the Department of Labor mean wage plus a 42.5 percent fringe, and record rules.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

Vermont prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

Vermont compliance summary
Law29 V.S.A. 161(b), the state construction prevailing wage provision for State projects.
AgencyThe Vermont Department of Labor publishes rates and takes wage complaints. Buildings and General Services decides whether its projects are covered.
Covered projectsState projects over $100,000, and projects over $200,000 at least 50 percent funded by a capital construction act or the Cash Fund. Agency of Transportation and Forests, Parks and Recreation projects are excluded.
How rates are setMean wage from the Department of Labor wage survey plus a 42.5 percent fringe. The 2026 schedule runs July 1, 2026 to June 30, 2027, in three areas.
Certified payrollNot set by statute. Follow the contract and the awarding agency's instructions.
Where to fileThe awarding agency, as the contract requires.
Contractor registrationNone for public works. The State may not contract with employers on the barred employer list.
ApprenticesRegistered apprentices may be paid 60 to 95 percent of the rate by hours completed. Unregistered apprentices get the full rate. Registration with Vermont or the home state is required.
Other requirementsUse local capable labor when practicable. Check the barred employer list kept by the Agency of Administration.
Record retentionNot set in 29 V.S.A. 161.
PenaltiesNot set in 29 V.S.A. 161. Complaints go to the Department of Labor Wage and Hour Division.
Recent changes2024 acts (Nos. 85 and 87, Adj. Sess.) amended section 161. H.B. 335 on payroll records, introduced in 2025, remains in committee.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law.

01 / In practice

Know when Vermont prevailing wage applies

Vermont's state prevailing wage is in 29 V.S.A. § 161, which sets requirements on State construction projects. It covers any State project with a construction cost over $100,000. It also covers projects over $200,000 that are at least 50 percent funded by a capital construction act, or at least 50 percent funded by the Cash Fund for Capital and Essential Investments. The section does not apply to maintenance or construction projects carried out by the Agency of Transportation or the Department of Forests, Parks and Recreation.

02 / In practice

How the rate is set

Covered contracts must pay all construction employees at least the mean prevailing wage published by the Vermont Department of Labor in its occupational employment and wage survey. On top of that wage, workers get a fringe benefit of 42.5 percent of wage. Fringe benefits include paid vacations and holidays, sick leave, and employer contributions to health insurance and retirement. A Joint Fiscal Office briefing to the Legislature says the fringe can be paid in benefits or in wages.

Where teams get burned

Most Vermont payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Find the rate schedule by area

The Department of Labor publishes a Vermont State Construction Prevailing Wage Rate Schedule each year. The 2026 schedule runs from July 1, 2026, to June 30, 2027, and is based on 2025 survey estimates. Rates are listed by occupation code for three areas: the Burlington-South Burlington metropolitan area, the Southern Vermont area, and the Northern Vermont area. The schedule lists wage rates only, so add the 42.5 percent fringe yourself. Registered apprentices may be paid a percentage of the rate for their occupation.

04 / In practice

Payroll records and reporting

Section 161 sets the wage but does not set a state certified payroll form or filing schedule. Reporting steps come from the contract and the awarding agency. Review each week's payroll internally against the schedule for the right area and occupation first. Then submit it in the format and on the schedule the contract requires. A 2025 bill on payroll records for State construction projects, H.335, was referred to committee and has not become law.

05 / In practice

Barred employers and local labor

The Agency of Administration must make sure the State and its subdivisions do not contract, directly or indirectly, with employers barred by the Commissioner of Labor or the Commissioner of Financial Regulation. The Agencies of Administration and Transportation publish the current list of barred employers on their websites. Section 161 also says local capable labor should be used on State projects whenever practicable. It does not require anyone to lay off a regular employee.

06 / In practice

When Davis-Bacon also applies

Many Vermont projects also carry federal money. The Davis-Bacon Act covers federal contracts over $2,000 for construction, and Related Acts extend it to federally assisted projects. The Joint Fiscal Office briefing says Davis-Bacon takes precedence over the state wage when both apply. Federal jobs need weekly certified payroll to the contracting agency. The WH-347 form is optional, and federal wage determinations are posted on SAM.gov.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

Does Vermont have a prevailing wage law?

Yes, for State construction projects. Under 29 V.S.A. § 161, State projects over $100,000 and certain capital projects over $200,000 must pay the Department of Labor's mean prevailing wage plus a 42.5 percent fringe benefit. There is no general state prevailing wage for local projects in the statute.

What is the 42.5 percent fringe in Vermont?

It is an amount equal to 42.5 percent of the listed wage, paid on top of the mean prevailing wage. The statute counts paid vacations, holidays, sick leave, and employer health and retirement contributions as fringe benefits. A Joint Fiscal Office briefing says the fringe can be paid as benefits or cash.

Do Agency of Transportation projects use the state wage?

No. Section 161(d) says the bidding, wage, and local labor rules in subsections (a) to (c) do not apply to maintenance or construction projects carried out by the Agency of Transportation. Federal-aid highway projects still follow Davis-Bacon when federal money is involved.

How often do I submit certified payroll in Vermont?

State law does not set a schedule for State construction projects. Follow the contract and the awarding agency's instructions. On federally funded work covered by Davis-Bacon, certified payroll is due every week. Confirm the recipient and format before work starts.