Mississippi certified payroll and prevailing wage reporting.

Mississippi has no state prevailing wage law for public works. See when federal Davis-Bacon weekly certified payroll and SAM.gov rates apply in Mississippi.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

Mississippi prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

Mississippi compliance summary
LawNone. Mississippi has no state prevailing wage law for public works.
AgencyNone at the state level. The U.S. Department of Labor Wage and Hour Division enforces Davis-Bacon on federally funded work.
Covered projectsNo state coverage. Only federally funded or assisted construction over $2,000 requires prevailing wages under Davis-Bacon.
How rates are setNo state rates. On federal work, use the Davis-Bacon wage determination attached to the contract, found on SAM.gov.
Certified payrollNot required by state law. Federal Davis-Bacon work only: weekly certified payroll with a signed Statement of Compliance. Form WH-347 is optional.
Where to fileFederal Davis-Bacon work only: the federal agency, or the applicant, sponsor or owner that passes payrolls to the federal agency.
Contractor registrationNo prevailing wage registration. A Certificate of Responsibility from the State Board of Contractors is needed to bid public projects of $50,000 or more.
ApprenticesNo state rule. On Davis-Bacon work, apprentices must be in a program registered with the U.S. Office of Apprenticeship or a recognized state agency, within the program's ratio.
Other requirementsNone under state prevailing wage law. Follow the contract's payroll terms on state and local jobs and Davis-Bacon posting rules on federal jobs.
Record retentionNo state rule. Davis-Bacon payroll records must be kept for 3 years after all work on the prime contract is completed.
PenaltiesNo state penalties. On Davis-Bacon work, the agency can withhold contract payments for back wages, and violators can be debarred for up to 3 years.
Recent changesNone found.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law.

01 / In practice

Mississippi has no state prevailing wage law

Mississippi does not have a state prevailing wage law for public works. The U.S. Department of Labor's table of state prevailing wage laws lists Mississippi as having no law, with no repeal date. No state agency sets prevailing wage rates or collects state certified payroll on projects paid only with state, county, or city money. Contractors on those jobs follow the contract and federal minimum wage and overtime law.

02 / In practice

Federal Davis-Bacon rules still apply

Federally funded or assisted construction contracts over $2,000 for public buildings or public works are covered by the Davis-Bacon and Related Acts. In Mississippi that often includes highway, water, sewer, housing, and disaster recovery projects that use federal money. Contractors and subcontractors must pay at least the wage and fringe rates in the wage determination attached to the contract. Wage determinations are published on SAM.gov under Public Buildings or Works. Use the determination in your contract, and classify each worker by the work actually performed.

Where teams get burned

Most Mississippi payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Submit weekly certified payroll on federal jobs

On Davis-Bacon work, each contractor and subcontractor submits payroll information every week. Payrolls go to the federal agency if it is a party to the contract. If not, they go to the applicant, sponsor, or owner, such as a city or state agency, which passes them to the federal agency. Form WH-347 is optional, but every payroll needs a Statement of Compliance signed by the contractor or subcontractor. Review each week internally against the wage determination first. Then submit it in the format the contracting agency requires.

04 / In practice

Find the right wage determination

The contracting agency picks the wage determination and attaches it to the bid documents and contract. Determinations on SAM.gov list wage and fringe rates by classification for the area where the work is done. Federal agencies use Standard Form 308 to request a determination. If your crew does work that no listed classification covers, ask the contracting agency about a conformance request before that work begins.

05 / In practice

What applies on state and local jobs

On Mississippi projects paid only with state or local money, no state statute requires prevailing wage or certified payroll. Pay is set by the contract and by federal minimum wage and overtime law. Any payroll reporting on those jobs comes from the contract terms. When you carry both kinds of work, tag each job as federal or nonfederal. That way each payroll uses the right rates, fringe tracking, and reporting schedule.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

Does Mississippi have a prevailing wage law?

No. Mississippi has no state prevailing wage law for public works, and the U.S. Department of Labor lists it as a state with no law. Federal Davis-Bacon rates still apply to federally funded or assisted construction contracts over $2,000 for public buildings or public works.

When do I file certified payroll in Mississippi?

On federally funded or assisted work covered by Davis-Bacon, submit certified payroll every week. It goes to the federal agency or to the entity that received the federal funds, such as a state agency or county. On purely state or local work, follow your contract terms.

Is Form WH-347 required?

No. The U.S. Department of Labor says use of Form WH-347 is optional. You must still submit the same payroll information every week, and each payroll needs a Statement of Compliance signed by the contractor or subcontractor. Legally valid electronic signatures are accepted.

Where do I find Davis-Bacon rates for Mississippi?

Search SAM.gov wage determinations under Public Buildings or Works. The determination that governs your job is the one attached to the bid documents and contract. Pay at least the listed rate and fringe for each classification, based on the work actually performed.

Start with one project.

Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.