Missouri certified payroll and prevailing wage reporting.

Missouri prevailing wage applies to public works over $75,000. Annual wage orders, certified payroll to the public body, affidavits, OSHA 10 rules and penalties.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

Missouri prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

Missouri compliance summary
LawMissouri Prevailing Wage Law, sections 290.210 to 290.340 RSMo, and the Occupational Title Rule, 8 CSR 30-3.
AgencyDepartment of Labor and Industrial Relations, Division of Labor Standards.
Covered projectsPublic works construction by or for a public body when the estimate or accepted bid is over $75,000. Maintenance work is excluded. Projects cannot be split to get under the threshold.
How rates are setThe Annual Wage Order, issued by July 1, uses weighted average survey wages by county and occupational title. Titles under 1,000 reported hours get the public works contracting minimum wage.
Certified payrollSubmit certified payroll records showing each worker's classification, hours and rate. Form LS-57 is available. The statute sets no frequency, so follow the contract.
Where to fileTo the public body running the project. An Affidavit of Compliance (PW-4) goes to the public body before final payment.
Contractor registrationNone found for state prevailing wage work.
Other requirementsPost rates at the site. On-site workers need OSHA 10 within 60 days. Overtime over 10 hours a day or 40 a week. Double pay on Sundays and holidays. Company signs on vehicles over $250,000.
Record retentionPayroll records cannot be destroyed or removed from Missouri for 1 year after the public work is completed.
Penalties$100 per worker per day underpaid. OSHA 10 violations cost $2,500 plus $100 per untrained employee per day. The public body withholds the amounts. The Division keeps a debarment list.
Recent changesNone found for prevailing wage. The Division issues a new Annual Wage Order each July 1.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law.

01 / In practice

Know when Missouri prevailing wage applies

The Division of Labor Standards, part of the Department of Labor and Industrial Relations, runs the program under sections 290.210 to 290.340 RSMo. The law covers public works construction paid for by a public body. Maintenance work is excluded. Under section 290.230, it does not apply when the engineer's estimate or accepted bid for the total project is $75,000 or less. A public body cannot split a project into smaller contracts to get under that amount. If a change order pushes a project over $75,000, the rates apply only to the portion above it.

02 / In practice

Find rates in the Annual Wage Order

The Division issues a final Annual Wage Order by July 1 each year. It lists rates by county and occupational title. Rates come from Contractor's Wage Surveys that contractors file with the Division, due electronically by January 31. Workers are classified under the Occupational Title Rule, 8 CSR 30-3. If fewer than 1,000 hours were reported for a title in a county, the public works contracting minimum wage applies instead. It equals 120 percent of the local average hourly wage. The public body asks the Division for the rates and puts them in the bid specifications and contract. For a job contracted and started within 60 days of the contract date, those rates stay in effect for the whole job.

Where teams get burned

Most Missouri payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Pay overtime and holiday rates

Section 290.230 sets premium pay on public works. Overtime is one and one-half times the base rate for work over 10 hours in a day or over 40 hours in a calendar week. Work on Sundays and listed holidays is paid at twice the base rate. Contractors and subcontractors must post the required wage rates at the job site in a prominent and easily accessible place for as long as workers are employed on the project, under section 290.265.

04 / In practice

Submit certified payroll to the public body

The Division tells contractors to submit certified payroll records to the public entity that runs the project. Each record shows every employee's classification, hours worked and rate of pay. The Division provides Contract Payroll Form LS-57 for this. Check the contract for the schedule, since the statute does not set one. Review each payroll internally against the wage order first. Then send it to the public body. Records must show each worker's name, occupation, craft, hours and actual wages paid.

05 / In practice

File the affidavit and keep records

When the work is complete, each contractor and subcontractor files an Affidavit of Compliance with the contracting public body. The Division's form is PW-4. Under section 290.290, the public body cannot make final payment until the affidavit is filed. Payroll records must stay open to inspection by the public body and the Division. They cannot be destroyed or removed from Missouri for one year after the public work is completed.

06 / In practice

Plan for OSHA training and penalties

Section 292.675 requires on-site workers on public works to complete a 10-hour OSHA construction safety program within 60 days of starting work, unless they already have. The contractor forfeits $2,500 plus $100 per employee for each day an untrained employee works after the grace periods. For underpayment, section 290.250 sets a penalty of $100 per worker for each calendar day the worker is paid less than the required rate. The public body withholds money to cover it.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

What is the Missouri prevailing wage threshold?

Prevailing wage does not apply when the engineer's estimate or the accepted bid for the total project cost is $75,000 or less. The total includes all labor, materials and supplies. A public body cannot divide a project into separate contracts to get below $75,000.

When does Missouri publish new prevailing wage rates?

The Division of Labor Standards issues the final Annual Wage Order by July 1 each year. It lists rates by county and occupational title. Rates can also change once a year on a collective bargaining agreement's anniversary date when the agreement schedules a raise.

Who receives Missouri certified payroll?

The Division tells contractors to submit certified payroll records to the public entity running the project. Records show each employee's classification, hours worked and rate of pay. Form LS-57 is available. The Division and the public body can also inspect payroll records directly.

What is the penalty for underpaying Missouri prevailing wage?

Under section 290.250, the contractor forfeits $100 for each worker for each calendar day, or part of a day, the worker is paid less than the required rate. The Division investigates complaints and issues a notice. The employer can dispute it in writing within 45 days, which leads to arbitration.

How long must I keep payroll records in Missouri?

Section 290.290 says payroll records cannot be destroyed or removed from the state for one year after the public work is completed. They must show each worker's name, occupation, craft, hours worked and actual wages paid. Your contract or federal rules may require longer retention.