Certified payroll / Field guide
Kansas certified payroll and prevailing wage reporting.
Kansas prevailing wage law was repealed in 1987 and local mandates are barred. Learn when federal Davis-Bacon weekly certified payroll applies in Kansas.

Compliance at a glance
Kansas prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | None. K.S.A. 44-201 was repealed effective July 1, 1987. K.S.A. 12-16,130 and 12-16,131 bar local wage mandates. |
| Agency | No state prevailing wage agency. The U.S. Department of Labor enforces Davis-Bacon on federal work. |
| Covered projects | No state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000. |
| How rates are set | No state rates. On Davis-Bacon work, the U.S. Department of Labor sets rates in wage determinations published on SAM.gov, and the contracting agency puts the right one in the contract. |
| Certified payroll | Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional. |
| Where to file | On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them. |
| Contractor registration | No state public works or prevailing wage registration found. |
| Apprentices | No state rules. On Davis-Bacon work, apprentices may be paid less only if individually registered in a registered program, within the program ratio. |
| Other requirements | On Davis-Bacon work, post the wage determination and the WH-1321 poster at the site where workers can easily see them. Local governments may not require construction contractors to pay above minimum wage or favor them for doing so. |
| Record retention | No state rule. On Davis-Bacon work, payroll records must be kept at least 3 years after all work on the prime contract is completed. |
| Penalties | No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years. |
| Recent changes | None found. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law. |
01 / In practice
Kansas has no state prevailing wage law
Kansas once had a prevailing wage statute, K.S.A. 44-201, with roots in an 1891 law. The Legislature repealed it in 1987 through L. 1987, ch. 186, effective July 1, 1987. Since then, no state law sets minimum wage rates for state, county, city, or school construction contracts. No state agency publishes Kansas prevailing wage rates or collects state certified payroll. The U.S. Department of Labor lists Kansas among the states that repealed their prevailing wage laws.
02 / In practice
Local governments cannot add their own rates
A 2013 law blocks local prevailing wage rules. K.S.A. 12-16,130 bars cities, counties, and other local units from requiring an employer to pay more than the minimum wage unless state or federal law requires it. K.S.A. 12-16,131 applies the same limit to construction contractors and subcontractors on construction or infrastructure projects. It also bars local policies, agreements, grants, or incentives that favor contractors based on wages above the minimum wage or extra benefits.
Where teams get burned
Most Kansas payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
Federal Davis-Bacon rules still apply
Federally funded or assisted construction contracts over $2,000 for public buildings or public works are covered by the Davis-Bacon and Related Acts. In Kansas that often includes highway, water, sewer, and housing projects that use federal money. Contractors and subcontractors must pay at least the wage and fringe rates in the wage determination attached to the contract. Wage determinations are published on SAM.gov under Public Buildings or Works. Use the determination in your contract, and classify each worker by the work actually performed.
04 / In practice
Submit weekly certified payroll on federal jobs
On Davis-Bacon work, each contractor and subcontractor submits payroll information every week. Payrolls go to the federal agency if it is a party to the contract. If not, they go to the applicant, sponsor, or owner, such as a city or state agency, which passes them to the federal agency. Form WH-347 is optional, but every payroll needs a Statement of Compliance signed by the contractor or subcontractor. Review each week internally against the wage determination first. Then submit it in the format the contracting agency requires.
05 / In practice
What applies on state and local jobs
On Kansas projects paid only with state or local money, pay is set by the contract and by state and federal minimum wage and overtime law. Any payroll reporting on those jobs comes from the contract terms, not from a state prevailing wage statute. When you carry both kinds of work, tag each job as federal or nonfederal. That way each payroll uses the right rates, fringe tracking, and reporting schedule.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- Kansas Office of Revisor of Statutes · K.S.A. 44-201 (repealed) ↗
- Kansas Office of Revisor of Statutes · K.S.A. 12-16,131 ↗
- U.S. Department of Labor · Government Contracts: Construction ↗
- U.S. Department of Labor · Form WH-347, Certified Payroll ↗
- U.S. Department of Labor · State Prevailing Wage Laws ↗
- U.S. Department of Labor · Fact Sheet #66: Davis-Bacon and Related Acts ↗
- eCFR · 29 CFR 5.5 Contract provisions ↗
Sources checked November 17, 2026.
Does Kansas have a prevailing wage law?
No. Kansas repealed K.S.A. 44-201 in 1987, effective July 1 of that year. There is no state prevailing wage rate for state or local public works. Federal Davis-Bacon rates still apply to federally funded or assisted construction contracts over $2,000 for public buildings or public works.
Can a Kansas city or county require prevailing wage?
No. K.S.A. 12-16,130 and 12-16,131, both enacted in 2013, bar cities, counties, and other local units from requiring employers to pay more than the minimum wage unless state or federal law requires it. Section 12-16,131 applies this limit to construction contractors and subcontractors.
When do I file certified payroll in Kansas?
On federally funded or assisted work covered by Davis-Bacon, submit certified payroll every week. It goes to the federal agency or to the entity that received the federal funds. On purely state or local work, follow the reporting terms in your contract, since no state statute requires certified payroll.
Where do I find Davis-Bacon rates for a Kansas project?
Look up wage determinations on SAM.gov under Public Buildings or Works. The determination that applies is normally attached to the bid documents and the contract. Pay at least those rates and fringes for each classification, based on the work each person actually performs.
Start with one project.
Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.
