Certified payroll / Field guide
Tennessee certified payroll and prevailing wage reporting.
Tennessee prevailing wage covers only state highway construction. The Prevailing Wage Commission sets yearly rates, and 2026 rates took effect January 1, 2026.

Compliance at a glance
Tennessee prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | Prevailing Wage Act for State Highway Construction Projects, Tenn. Code Ann. 12-4-401 to 12-4-415, as amended effective January 1, 2014. |
| Agency | The five-member Prevailing Wage Commission sets rates. The Department of Labor and Workforce Development, Labor Standards Unit, handles administration. |
| Covered projects | State contracts to build, rebuild, locate, relocate, or repair streets, highways, or bridges. No dollar threshold. There is no state prevailing wage on non-highway construction. |
| How rates are set | The commission averages contractor-certified hourly rates for one statewide area and may adjust by up to 6 percent. Rates take effect each January 1 and are posted on the department's Prevailing Wage page. |
| Certified payroll | No state form or schedule. Contractors furnish the state agency any forms, payroll copies, or other information it requires to show compliance. |
| Where to file | The state agency that awarded the contract, as its contract specifies. |
| Contractor registration | None under the Act. |
| Apprentices | None. The Act has no apprentice rates, ratios, or utilization rules. |
| Other requirements | Post the contract wage rates in a conspicuous place at the job site. The contractor's bond must guarantee compliance with the Act. |
| Record retention | Keep payroll records for one year after the state highway construction project is completed. |
| Penalties | The commission or an underpaid worker can sue on the performance bond. If the bond is breached, the agency can readvertise and relet the contract. The Act sets no fines. |
| Recent changes | None found. The 2026 Highway Prevailing Wage Rates took effect January 1, 2026, with 25 crafts. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law. |
01 / In practice
Tennessee prevailing wage covers state highway work only
Tennessee's law is the Prevailing Wage Act for State Highway Construction Projects, Tennessee Code sections 12-4-401 to 12-4-415. The current version took effect January 1, 2014, after a 2013 amendment. It covers state contracts to build, rebuild, locate, relocate, or repair streets, highways, or bridges. The U.S. Department of Labor notes that Tennessee has no prevailing wage on non-highway construction, so state-funded buildings are not covered.
02 / In practice
How the Prevailing Wage Commission sets rates
A five-member Prevailing Wage Commission, chaired by the commissioner of labor and workforce development, sets the rates. Highway contractors may certify payroll data from the prior quarter by October 31. The state is one statewide area. The commission averages the hourly rate for each classification and may adjust it by up to 6 percent. It gives notice by December 1, holds a public hearing within ten days, and issues a final determination within ten days after that.
Where teams get burned
Most Tennessee payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
Find the current rates
The Tennessee Department of Labor and Workforce Development posts the highway rates each year. The 2026 Highway Prevailing Wage Rates took effect January 1, 2026, and list 25 crafts. Examples include $23.52 for an unskilled laborer, $26.40 for a skilled laborer, and $39.21 for an electrician. The state agency gets the rates from the commission before bidding and attaches them to the specifications, bid forms, and contract.
04 / In practice
Post rates and give payroll to the state agency
Each highway contractor and subcontractor must post the contract wage rates in a conspicuous place at the job site. The Act does not set a payroll form or schedule. Instead, contractors furnish the state agency any forms, payroll copies, or other information it requires to show compliance. Review payroll internally against the contract rates first. Then submit it the way the agency's contract specifies. Keep payroll records for one year after the project is completed.
05 / In practice
Bonds, enforcement, and federal-aid projects
The contractor's bond must include a promise to meet every requirement of the Act. The commission or an underpaid worker can sue on the bond. If the bond is breached, the state agency can readvertise and relet the contract. On federally funded or assisted construction over $2,000, Davis-Bacon applies, with weekly certified payroll to the contracting agency. Form WH-347 is optional, and federal wage determinations are on SAM.gov.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- Tennessee Department of Labor and Workforce Development · Prevailing Wage ↗
- Tennessee Department of Labor and Workforce Development · Prevailing Wage Act for State Highway Construction Projects ↗
- U.S. Department of Labor · State Prevailing Wage Laws ↗
- SAM.gov · Wage Determinations ↗
- U.S. Department of Labor · Davis-Bacon and Related Acts ↗
Sources checked November 17, 2026.
Does Tennessee have a prevailing wage law?
Yes, but only for state highway construction. The Prevailing Wage Act for State Highway Construction Projects, Tennessee Code sections 12-4-401 to 12-4-415, covers state contracts for streets, highways, and bridges. There is no state prevailing wage on non-highway construction, such as buildings.
When do Tennessee highway prevailing wage rates change?
Each year. The commission gives notice of its determination by December 1, then holds a public hearing and issues a final determination. The 2026 Highway Prevailing Wage Rates took effect January 1, 2026. The rates in your contract apply to that contract.
How do I submit certified payroll on a Tennessee highway project?
The Act requires contractors to give the state agency any forms, payroll copies, or other information it requires to show compliance. It does not set its own form or frequency. Follow the contract. Federal-aid projects also follow Davis-Bacon weekly certified payroll rules.
How long must I keep payroll records in Tennessee?
Section 12-4-411 says payroll records must not be destroyed for one year after the state highway construction project is completed. On federally funded work, federal rules require the agency to keep certified payrolls for 3 years after the prime contract is complete.